GTR Data Center, Petah Tikva
GTR Data Center, Petah Tikva
Israel, Petah Tikva
Logistics
Under Construction
GTR Data Center, Petah Tikva
Israel, Petah Tikva
Logistics
Under Construction
Base Pile has carried out demolition, shoring, foundation and ground anchor works at the advanced Data Centre compound located close to Petah Tikva’s major Hi Tech centres.
70,000 cu.m.
Excavation to a depth of 16 m.
43
Support walls at a depth of 30 m..
753
Anchors at a depth of 16 m.


Demolition and infrastructure works at a data centre complex
The new Data Centre complex in Petah Tikva covers an area of some 12,000 sq.m., including a two-storey structure built over two basement levels.
The underground works in the complex included demolition of a petrol station situated on the site and clearance of all the waste surrounding it, excavation of about 70,000 cu.m. over an area of 4.2 dunams (4,200 sq.m.) and to a depth of 16 m., erection of perimeter retaining walls at a depth of 30 m., placement of 753 anchors with a length of 21 m., and a water table lowering process for the excavation of Level -2 .
The central challenge in the course of the work was to deal with the clay or thick clay soil. Starting from a depth of 20 m. the soil turns into hard limestone or rock, necessitating the employment of innovative equipment and a highly qualified team to penetrate the tough layer.