Leumi Card Building, Bnei Brak

Israel, Bnei Brak

Grounding

Completed

Leumi Card Building, Bnei Brak

Israel, Bnei Brak

Grounding

Completed

 Base Pile has carried out a variety of shoring, excavation and ground anchor installation works as part of the construction of a 9-storey building in Bene Berak, serving as an operations centre for MAX by Leumi Card.

7Dunams

Area of complex

22,000sqm

Area of building

4Level

Underground car park

Leumi Card Building, Bnei Brak
Leumi Card Building, Bnei Brak

Placement of Anchors beneath Water Table

The Leumi Card building is a 9-storey structure in Bnei Brak extending over an approx. 22,000 sq.m. area, erected over a 4-level underground car park. 

Within the site area, Base Pile performed slurry wall shoring works by means of restraining piles and excavations to the depth of 4 underground parking levels. Works also included the placement of anchors below the water table, including drilling with a casing by a Hütte anchor machine and the use of a jet grout plug. Works on the construction site proceeded with the aid of the Company’s fleet of advanced excavator cranes, operated by skilled and experienced professionals while comprehensively profiling the ground conditions.